• Why does it take so long to build an offshore wind farm?

  • Jul 9 2024
  • Duración: 37 m
  • Podcast

Why does it take so long to build an offshore wind farm?  Por  arte de portada

Why does it take so long to build an offshore wind farm?

  • Resumen

  • On this episode of the Clean Energy Pod, powered by SSE, we chat with Paul Cooley, Director of Offshore Wind at SSE. We discuss why it takes so long to build an offshore wind farm. What changes are needed to meet the UK's net zero targets. And we talk about building the world's largest offshore wind farm, Dogger Bank.

    This recording took place on Tuesday 2 July 2024, before the UK general election.

    SSE, plc website: sse.com
    SSE careers: careers.sse.com/homepage
    LinkedIn: linkedin.com/company/12481
    X (formerly Twitter): x.com/SSE
    Instagram: instagram.com/sseplc
    YouTube: https://www.youtube.com/channel/UCvIYX7HvZJqODMRynAPf6aw

    Más Menos
activate_primeday_promo_in_buybox_DT

Lo que los oyentes dicen sobre Why does it take so long to build an offshore wind farm?

Calificaciones medias de los clientes

Reseñas - Selecciona las pestañas a continuación para cambiar el origen de las reseñas.