-
Critical Path
- The Critical Series, Book 2
- Narrated by: Luke Daniels
- Length: 9 hrs and 55 mins
Failed to add items
Add to Cart failed.
Add to Wish List failed.
Remove from wishlist failed.
Adding to library failed
Follow podcast failed
Unfollow podcast failed
![Prime logo](https://m.media-amazon.com/images/G/01/Audible/Homestead/Prime_Logo_RGB.png)
Get 2 free audiobooks during trial.
Buy for $27.99
No default payment method selected.
We are sorry. We are not allowed to sell this product with the selected payment method
Listeners also enjoyed...
-
Infinite
- By: Jeremy Robinson
- Narrated by: R.C. Bray
- Length: 10 hrs and 21 mins
- Unabridged
-
Overall
-
Performance
-
Story
The Galahad, a faster-than-light spacecraft, carries 50 scientists and engineers on a mission to prepare Kepler 452b, Earth's nearest habitable neighbor at 1400 light years away. With Earth no longer habitable and the Mars colony slowly failing, they are humanity's best hope. After 10 years in a failed cryogenic bed - body asleep, mind awake - William Chanokh's torture comes to an end as the fog clears, the hatch opens, and his friend and fellow hacker, Tom, greets him...by stabbing a screwdriver into his heart. This is the first time William dies.
-
-
a rather complex science fiction story
- By Midwestbonsai on 12-26-17
By: Jeremy Robinson
-
Ruins of the Earth
- Ruins of the Earth, Book 1
- By: Christopher Hopper, J. N. Chaney
- Narrated by: R.C. Bray
- Length: 15 hrs and 59 mins
- Unabridged
-
Overall
-
Performance
-
Story
A secret buried in the Antarctic. A puzzle unsolved for thousands of years. And a Brooklyn-born master gunnery sergeant who's royally pissed that he has to babysit the researchers sent to figure it all out. But when Patrick "Wic" Finnegan finally sees what the team has uncovered, he can't believe his eyes, nor is he prepared for the violence to come. Soon, the portal opens and unleashes a storm of unbridled fury upon humanity.
-
-
I really wanted to like this.
- By Jeremy Korpi on 04-06-21
By: Christopher Hopper, and others
-
The Crypt: Shakedown
- The Crypt, Book 1
- By: Scott Sigler
- Narrated by: Ray Porter
- Length: 16 hrs and 57 mins
- Unabridged
-
Overall
-
Performance
-
Story
Few know the warship’s actual name. But everyone has heard the rumors. The PUV James Keeling can do something no other vessel in existence can do—slip into another dimension, travel undetected, then re-emerge onto our plane and surprise enemy targets. But the thing that makes the Crypt unique also makes it a nightmare for those onboard; interdimensional travel causes hallucinations, violent behavior, and psychotic breakdowns. Keeling could be the Union’s greatest weapon, a game-changing asset that can defeat the bloodthirsty zealots of the Purist Nation, the Union’s mortal enemy.
-
-
classic sigler
- By martin on 10-05-23
By: Scott Sigler
-
Lock In (Narrated by Wil Wheaton)
- By: John Scalzi
- Narrated by: Wil Wheaton
- Length: 9 hrs and 56 mins
- Unabridged
-
Overall
-
Performance
-
Story
Not too long from today, a new, highly contagious virus makes its way across the globe. Most who get sick experience nothing worse than flu, fever, and headaches. But for the unlucky one percent - and nearly five million souls in the United States alone - the disease causes "Lock In": Victims fully awake and aware, but unable to move or respond to stimulus. The disease affects young, old, rich, poor, people of every color and creed. The world changes to meet the challenge.
-
-
Fun! Things you might want to know:
- By Alexis on 08-29-14
By: John Scalzi
-
Contamination Super Boxed Set (Books 0-7)
- The Complete Post-Apocalyptic Series
- By: T.W. Piperbrook
- Narrated by: Troy Duran
- Length: 34 hrs and 18 mins
- Unabridged
-
Overall
-
Performance
-
Story
The infection has begun, ravaging the American Southwest and leaving chaos in its wake. In this new world, there will be no last meal, no dying wish. The only reward left is to survive another day...The complete Contamination series - all in this one, special edition.
-
-
absolute garbage writing.
- By James mullins on 04-23-22
By: T.W. Piperbrook
-
Wayward Galaxy
- By: Jason Anspach, J. N. Chaney
- Narrated by: R.C. Bray
- Length: 12 hrs and 49 mins
- Unabridged
-
Overall
-
Performance
-
Story
A company of Army Rangers is sent on an interstellar colony ship to secure a foothold on a dangerous, alien planet through violence of action. Leaving behind a warring Earth flung headfirst into a conflict of mutual assured destruction, the Rangers and the accompanying crew of first colonists are guided on a 40-year journey by an unprecedented artificial intelligence. But when they emerge from the frigid embrace of cryosleep, they awake to a nightmare, finding themselves greeted by the same ruthless enemy that brought about the ruin of Earth.
-
-
A breath of fresh air
- By Anonymous User on 09-29-20
By: Jason Anspach, and others
-
Infinite
- By: Jeremy Robinson
- Narrated by: R.C. Bray
- Length: 10 hrs and 21 mins
- Unabridged
-
Overall
-
Performance
-
Story
The Galahad, a faster-than-light spacecraft, carries 50 scientists and engineers on a mission to prepare Kepler 452b, Earth's nearest habitable neighbor at 1400 light years away. With Earth no longer habitable and the Mars colony slowly failing, they are humanity's best hope. After 10 years in a failed cryogenic bed - body asleep, mind awake - William Chanokh's torture comes to an end as the fog clears, the hatch opens, and his friend and fellow hacker, Tom, greets him...by stabbing a screwdriver into his heart. This is the first time William dies.
-
-
a rather complex science fiction story
- By Midwestbonsai on 12-26-17
By: Jeremy Robinson
-
Ruins of the Earth
- Ruins of the Earth, Book 1
- By: Christopher Hopper, J. N. Chaney
- Narrated by: R.C. Bray
- Length: 15 hrs and 59 mins
- Unabridged
-
Overall
-
Performance
-
Story
A secret buried in the Antarctic. A puzzle unsolved for thousands of years. And a Brooklyn-born master gunnery sergeant who's royally pissed that he has to babysit the researchers sent to figure it all out. But when Patrick "Wic" Finnegan finally sees what the team has uncovered, he can't believe his eyes, nor is he prepared for the violence to come. Soon, the portal opens and unleashes a storm of unbridled fury upon humanity.
-
-
I really wanted to like this.
- By Jeremy Korpi on 04-06-21
By: Christopher Hopper, and others
-
The Crypt: Shakedown
- The Crypt, Book 1
- By: Scott Sigler
- Narrated by: Ray Porter
- Length: 16 hrs and 57 mins
- Unabridged
-
Overall
-
Performance
-
Story
Few know the warship’s actual name. But everyone has heard the rumors. The PUV James Keeling can do something no other vessel in existence can do—slip into another dimension, travel undetected, then re-emerge onto our plane and surprise enemy targets. But the thing that makes the Crypt unique also makes it a nightmare for those onboard; interdimensional travel causes hallucinations, violent behavior, and psychotic breakdowns. Keeling could be the Union’s greatest weapon, a game-changing asset that can defeat the bloodthirsty zealots of the Purist Nation, the Union’s mortal enemy.
-
-
classic sigler
- By martin on 10-05-23
By: Scott Sigler
-
Lock In (Narrated by Wil Wheaton)
- By: John Scalzi
- Narrated by: Wil Wheaton
- Length: 9 hrs and 56 mins
- Unabridged
-
Overall
-
Performance
-
Story
Not too long from today, a new, highly contagious virus makes its way across the globe. Most who get sick experience nothing worse than flu, fever, and headaches. But for the unlucky one percent - and nearly five million souls in the United States alone - the disease causes "Lock In": Victims fully awake and aware, but unable to move or respond to stimulus. The disease affects young, old, rich, poor, people of every color and creed. The world changes to meet the challenge.
-
-
Fun! Things you might want to know:
- By Alexis on 08-29-14
By: John Scalzi
-
Contamination Super Boxed Set (Books 0-7)
- The Complete Post-Apocalyptic Series
- By: T.W. Piperbrook
- Narrated by: Troy Duran
- Length: 34 hrs and 18 mins
- Unabridged
-
Overall
-
Performance
-
Story
The infection has begun, ravaging the American Southwest and leaving chaos in its wake. In this new world, there will be no last meal, no dying wish. The only reward left is to survive another day...The complete Contamination series - all in this one, special edition.
-
-
absolute garbage writing.
- By James mullins on 04-23-22
By: T.W. Piperbrook
-
Wayward Galaxy
- By: Jason Anspach, J. N. Chaney
- Narrated by: R.C. Bray
- Length: 12 hrs and 49 mins
- Unabridged
-
Overall
-
Performance
-
Story
A company of Army Rangers is sent on an interstellar colony ship to secure a foothold on a dangerous, alien planet through violence of action. Leaving behind a warring Earth flung headfirst into a conflict of mutual assured destruction, the Rangers and the accompanying crew of first colonists are guided on a 40-year journey by an unprecedented artificial intelligence. But when they emerge from the frigid embrace of cryosleep, they awake to a nightmare, finding themselves greeted by the same ruthless enemy that brought about the ruin of Earth.
-
-
A breath of fresh air
- By Anonymous User on 09-29-20
By: Jason Anspach, and others
-
Below Us
- The Abyss, Book 1
- By: Nathan Hystad
- Narrated by: Marc Vietor
- Length: 9 hrs and 22 mins
- Unabridged
-
Overall
-
Performance
-
Story
After a rough break up, Wyatt moves to New York City, eager to prove himself while working on Wall Street. When he’s asked to visit the father of his ex-girlfriend, a billionaire tycoon, his fate is sealed. The revolutionary company, Nu-En, launches a radical innovation, an energy that will allow every person on the planet access to power. Only it doesn’t perform as anticipated. Harnessing the ocean has consequences, and highly dangerous creatures emerge from the depths. Soon, the Earth is fracturing, and the world will never be the same.
-
-
Interesting story but..
- By Mike Fedotov on 09-28-23
By: Nathan Hystad
-
Generation Ship
- A Novel
- By: Michael Mammay
- Narrated by: Natalie Naudus
- Length: 16 hrs and 12 mins
- Unabridged
-
Overall
-
Performance
-
Story
In 2108, Colony Ship Voyager departed Earth for the planet of Promissa with 18,000 of the world’s best and brightest on board. 250 years and 27 light years later, an arrival is imminent. But all is not well. The probes that they’ve sent ahead to gather the data needed to establish any kind of settlement aren’t responding, and the information they have received has presented more questions than answers. It’s a time when the entire crew should be coming together to solve the problem, but science officer Sheila Jackson can’t get people to listen.
-
-
Little too much political shenanigans for me😬
- By Samuel Warren on 10-19-23
By: Michael Mammay
-
Hell Divers
- Hell Divers Series, Book 1
- By: Nicholas Sansbury Smith
- Narrated by: R.C. Bray
- Length: 10 hrs and 11 mins
- Unabridged
-
Overall
-
Performance
-
Story
More than two centuries after World War III poisoned the planet, the final bastion of humanity lives on massive airships circling the globe in search of a habitable area to call home. Aging and outdated, most of the ships plummeted back to Earth long ago. The only thing keeping the two surviving lifeboats in the sky are Hell Divers - men and women who risk their lives by skydiving to the surface to scavenge for parts the ships desperately need.
-
-
A little cliche action hero-y but damn good story anyway
- By Jillian Noone on 09-04-19
-
One Second After
- By: William R. Forstchen
- Narrated by: Joe Barrett
- Length: 13 hrs and 17 mins
- Unabridged
-
Overall
-
Performance
-
Story
Already cited on the floor of Congress and discussed in the corridors of the Pentagon as a book all Americans should read, One Second After is the story of a war scenario that could become all too terrifyingly real. Based upon a real weapon - the Electro Magnetic Pulse (EMP) - which may already be in the hands of our enemies, it is a truly realistic look at the awesome power of a weapon that can destroy the entire United States.
-
-
A Civil War Re-enactor Saves a Community?
- By Cidney on 07-05-12
-
Memory's Legion
- The Complete Expanse Story Collection
- By: James S. A. Corey
- Narrated by: Jefferson Mays, Daniel Abraham, Ty Franck
- Length: 16 hrs and 22 mins
- Unabridged
-
Overall
-
Performance
-
Story
On Mars, a scientist experiments with a new engine that will one day become the drive that fuels humanity's journey into the stars. On an asteroid station, a group of prisoners are oblivious to the catastrophe that awaits them. On a future Earth beset by overpopulation, pollution, and poverty, a crime boss desperately seeks to find a way off planet. On an alien world, a human family struggles to establish a colony and make a new home. All these stories and more are featured in this unmissable collection of short fiction set in the hardscrabble world of The Expanse.
-
-
Its about damn time...
- By Samuel Warren on 03-15-22
-
Steel World
- Undying Mercenaries, Book 1
- By: B. V. Larson
- Narrated by: Mark Boyett
- Length: 12 hrs and 7 mins
- Unabridged
-
Overall
-
Performance
-
Story
In the 20th century Earth sent probes, transmissions, and welcoming messages to the stars. Unfortunately, someone noticed. The Galactics arrived with their battle fleet in 2052. Rather than being exterminated under a barrage of hell-burners, Earth joined their vast Empire. Swearing allegiance to our distant alien overlords wasn't the only requirement for survival. We also had to have something of value to trade, something that neighboring planets would pay their hard-earned credits to buy. As most of the local worlds were too civilized to have a proper army, the only valuable service Earth could provide came in the form of soldiers....
-
-
A 14 year old boy’s idea of a “Real Man”
- By C. Brown on 04-16-19
By: B. V. Larson
-
E-Day
- E-Day, Book 1
- By: Nicholas Sansbury Smith
- Narrated by: R.C. Bray
- Length: 15 hrs and 10 mins
- Unabridged
-
Overall
-
Performance
-
Story
Engines. Genetically modified warriors that keep the great Nova Alliance war machine churning against the enemy Coalition. Most days, Engines are all that stand between salvation and chaos. Led by legendary Engine Captain Akira Hayashi, Shadow Squad has fought on the frontlines for a decade. They are on the brink of victory when the Coalition launches a series of desperate and devastating attacks that cripple the Nova Alliance restoration sites vital to save the dying planet.
-
-
Kicking New Series Opener! Wow!
- By Cindy on 07-09-21
-
The Trackers Series Box Set
- The Trackers Series, Books 1-4
- By: Nicholas Sansbury Smith
- Narrated by: Bronson Pinchot
- Length: 33 hrs and 59 mins
- Unabridged
-
Overall
-
Performance
-
Story
Ripped from the headlines, the explosive Trackers saga is a realistic depiction of what an EMP attack and the aftermath might look like from one of the genre's leading voices, USA Today best-selling author and former Homeland Security disaster mitigation officer Nicholas Sansbury Smith. This box set includes the entire four-book Trackers series with over 30 hours of post-apocalyptic survival fiction and action. This box set includes Trackers, Trackers 2: The Hunted, Trackers 3: The Storm, and Trackers 4: The Damned.
-
-
Honorable, brave, and selfless!
- By RJ on 11-10-18
-
Slip Runner
- By: J.N. Chaney, M.F. Lerma
- Narrated by: Neill Thorne
- Length: 8 hrs and 18 mins
- Unabridged
-
Overall
-
Performance
-
Story
Cole Riker is a Slip Runner. A contractor tasked with finding alien salvage in exchange for credits. For an ex-smuggler like Cole, there’s a catch: Don’t break the terms of parole. That means doing things by the book. Find salvage, turn it in, get paid. But everything changes when a retrieval mission lands him in a previously unknown sector. There, he finds the material he’s been sent to recover, along with something more. A brand-new form of ancient alien life.
-
-
Great Start on a new Renegade Universe Series
- By Robert Meridy Jr on 11-04-22
By: J.N. Chaney, and others
-
The Tyr: Arrival
- The Tyr Trilogy, Book 1
- By: Richard Fox
- Narrated by: R.C. Bray
- Length: 11 hrs and 35 mins
- Unabridged
-
Overall
-
Performance
-
Story
Daniel Clay fought across the galaxy as a corporate soldier. He left the violence behind for a life of science, raising a family far from the bloodshed of the Corporation. With his wife, Sarah, and son, Michael, he studied the alien Tyr for years, hidden among their complex societies. Their mission should have ended with the arrival of a replacement team. Instead, the Clays’ corporate overlords choose a death sentence: an invasion fleet to conquer the Tyr.
-
-
Very solid, almost missed it.
- By AJ Woodburn on 09-20-21
By: Richard Fox
-
Solitude
- Dimension Space, Book One
- By: Dean M. Cole
- Narrated by: R.C. Bray, Julia Whelan
- Length: 8 hrs and 50 mins
- Unabridged
-
Overall
-
Performance
-
Story
The Martian meets Gravity when Army Pilot Vaughn Singleton, Earth’s last man, rushes to Area 51 in search of a spaceplane after he discovers the last woman is stranded on the International Space Station and barely alive - thus beginning a race against time. The event that wiped life from the planet started at the supercollider. It created a rift in space-time. The astronaut stranded aboard the space station, Commander Angela Brown, is a theoretical physicist who used to work at the collider.
-
-
Eh...
- By Philip Maddox on 10-19-17
By: Dean M. Cole
-
SecondWorld
- By: Jeremy Robinson
- Narrated by: Phil Gigante
- Length: 11 hrs and 20 mins
- Unabridged
-
Overall
-
Performance
-
Story
Lincoln Miller, an ex-Navy SEAL turned NCIS special agent, is sent to Aquarius, the world’s only sub-oceanic research facility, located off the Florida Keys, to investigate reports of ocean dumping. A week into his stay, strange red flakes descend from the surface. Scores of fish are dead and dying, poisoned by the debris that turns to powder in Miller’s fingers and tastes like blood. Miller heads for the surface, ready to fight whoever is polluting on his watch. But he finds nothing. No ships. No polluters.... No oxygen.
-
-
THE AIR TASTED LIKE BLOOD
- By Jim "The Impatient" on 10-11-16
By: Jeremy Robinson
Publisher's summary
Destroying the croatoan's seat of power has grave consequences. Earth faces destruction unless bitter enemies can work together.
Earth is recovering after Denver and his group managed to stamp out the immediate alien threat. Now Denver and his team, stationed in a liberated croatoan farm, plan to restore humanity as the dominant force. But when shocking information comes to light, they set off on an immediate mission north.
The team encounter a hybrid city where humans and croatoans live and work together. It's here in this strange new civilization that Denver discovers there's a bigger threat to the planet than the aliens already on the surface: Something far more terrible is coming. It'll be a race against the clock to defeat this new threat, and Denver will need all the help he can get.
More from the same
Related to this topic
-
Critical Dawn
- The Critical Series, Book 1
- By: Darren Wearmouth, Colin F. Barnes
- Narrated by: Luke Daniels
- Length: 10 hrs and 21 mins
- Unabridged
-
Overall
-
Performance
-
Story
Archaeologists Pippa Quinn and Charlie Jackson find advanced technology in undisturbed 16th-century graves. A portent, the discovery precedes thousands of giant sinkholes opening up across the globe as extreme weather threatens the population. Charlie suspects the two are related.
-
-
Younger adult sci-if.
- By William W on 07-22-15
By: Darren Wearmouth, and others
-
Code Breakers: Prequel
- By: Colin F. Barnes
- Narrated by: Marc Vietor
- Length: 2 hrs and 19 mins
- Unabridged
-
Overall
-
Performance
-
Story
Rogue hackers Petal and Gabriel are low on food and water. Their reputation precedes them and they are no longer able to hustle the crime community for supplies. With survival becoming harder, they’re left with no other choice but to accept a risky job from a dangerous individual. The two will have to negotiate with the Tinker - a woman whose reputation for psychotic behaviour is known across the nuclear-blasted Abandoned Lands; infiltrate a town overrun with killers; and recover a cache of exceptionally rare information.
-
-
Good action and plot - terrible world building
- By J. S. Bowers on 12-08-18
By: Colin F. Barnes
-
The Ark
- Children of a Dead Earth, Book 1
- By: Patrick S. Tomlinson
- Narrated by: Mirron Willis
- Length: 11 hrs and 6 mins
- Unabridged
-
Overall
-
Performance
-
Story
Humankind has escaped a dying Earth and set out to find a new home among the stars aboard an immense generation ship affectionately named the Ark. Bryan Benson is the Ark's greatest living sports hero, enjoying retirement working as a detective in Avalon, his home module. The hours are good, the work is easy, and the perks can't be beat. But when a crew member goes missing, Bryan is thrust into the center of an ever-expanding web of deception, secrets, and violence.
-
-
Nearly there
- By Michaela on 05-11-16
-
The Event
- By: Nathan Hystad
- Narrated by: Luke Daniels
- Length: 6 hrs and 33 mins
- Unabridged
-
Overall
-
Performance
-
Story
Cities all around the world reported strange alien vessels descending. Some saw them as the heralds of a new age; others fired everything they had at them. All were taken as the beams lashed down and drew them into the sky. Dean was left behind, seemingly the last man on Earth. A trail of clues left by his dead wife guides Dean on a perilous journey across America and beyond to learn the truth behind the mysterious ships and save humanity from its doom.
-
-
Did not inspire me to get the next book.
- By MD on 12-13-18
By: Nathan Hystad
-
Earth Unknown
- Forgotten Earth, Book 1
- By: M.R. Forbes
- Narrated by: Jonathan Davis
- Length: 10 hrs and 3 mins
- Unabridged
-
Overall
-
Performance
-
Story
Two hundred years ago, a fleet of colony ships left Earth and started a settlement on Proxima Centauri. Centurion Space Force pilot Nathan Stacker didn't expect to return home to find his wife dead. He didn't expect the murderer to look just like him, and he definitely didn't expect to be the one to take the blame. But his wife had control of a powerful secret. A secret that stretches across the light years between two worlds and could lead to the end of both. Now that secret is in Nathan's hands, and he's about to make the most desperate evasive maneuver of his life.
-
-
Half a story.
- By RBD 2 on 03-29-21
By: M.R. Forbes
-
The Breakers Omnibus
- Books 1-3 and Prequel Novella
- By: Edward W. Robertson
- Narrated by: Ray Chase
- Length: 42 hrs and 23 mins
- Unabridged
-
Overall
-
Performance
-
Story
Books 1-3 and the prequel novella of the Breakers series.
-
-
So glad I downloaded this one.
- By Stevie Havoc on 11-16-15
-
Critical Dawn
- The Critical Series, Book 1
- By: Darren Wearmouth, Colin F. Barnes
- Narrated by: Luke Daniels
- Length: 10 hrs and 21 mins
- Unabridged
-
Overall
-
Performance
-
Story
Archaeologists Pippa Quinn and Charlie Jackson find advanced technology in undisturbed 16th-century graves. A portent, the discovery precedes thousands of giant sinkholes opening up across the globe as extreme weather threatens the population. Charlie suspects the two are related.
-
-
Younger adult sci-if.
- By William W on 07-22-15
By: Darren Wearmouth, and others
-
Code Breakers: Prequel
- By: Colin F. Barnes
- Narrated by: Marc Vietor
- Length: 2 hrs and 19 mins
- Unabridged
-
Overall
-
Performance
-
Story
Rogue hackers Petal and Gabriel are low on food and water. Their reputation precedes them and they are no longer able to hustle the crime community for supplies. With survival becoming harder, they’re left with no other choice but to accept a risky job from a dangerous individual. The two will have to negotiate with the Tinker - a woman whose reputation for psychotic behaviour is known across the nuclear-blasted Abandoned Lands; infiltrate a town overrun with killers; and recover a cache of exceptionally rare information.
-
-
Good action and plot - terrible world building
- By J. S. Bowers on 12-08-18
By: Colin F. Barnes
-
The Ark
- Children of a Dead Earth, Book 1
- By: Patrick S. Tomlinson
- Narrated by: Mirron Willis
- Length: 11 hrs and 6 mins
- Unabridged
-
Overall
-
Performance
-
Story
Humankind has escaped a dying Earth and set out to find a new home among the stars aboard an immense generation ship affectionately named the Ark. Bryan Benson is the Ark's greatest living sports hero, enjoying retirement working as a detective in Avalon, his home module. The hours are good, the work is easy, and the perks can't be beat. But when a crew member goes missing, Bryan is thrust into the center of an ever-expanding web of deception, secrets, and violence.
-
-
Nearly there
- By Michaela on 05-11-16
-
The Event
- By: Nathan Hystad
- Narrated by: Luke Daniels
- Length: 6 hrs and 33 mins
- Unabridged
-
Overall
-
Performance
-
Story
Cities all around the world reported strange alien vessels descending. Some saw them as the heralds of a new age; others fired everything they had at them. All were taken as the beams lashed down and drew them into the sky. Dean was left behind, seemingly the last man on Earth. A trail of clues left by his dead wife guides Dean on a perilous journey across America and beyond to learn the truth behind the mysterious ships and save humanity from its doom.
-
-
Did not inspire me to get the next book.
- By MD on 12-13-18
By: Nathan Hystad
-
Earth Unknown
- Forgotten Earth, Book 1
- By: M.R. Forbes
- Narrated by: Jonathan Davis
- Length: 10 hrs and 3 mins
- Unabridged
-
Overall
-
Performance
-
Story
Two hundred years ago, a fleet of colony ships left Earth and started a settlement on Proxima Centauri. Centurion Space Force pilot Nathan Stacker didn't expect to return home to find his wife dead. He didn't expect the murderer to look just like him, and he definitely didn't expect to be the one to take the blame. But his wife had control of a powerful secret. A secret that stretches across the light years between two worlds and could lead to the end of both. Now that secret is in Nathan's hands, and he's about to make the most desperate evasive maneuver of his life.
-
-
Half a story.
- By RBD 2 on 03-29-21
By: M.R. Forbes
-
The Breakers Omnibus
- Books 1-3 and Prequel Novella
- By: Edward W. Robertson
- Narrated by: Ray Chase
- Length: 42 hrs and 23 mins
- Unabridged
-
Overall
-
Performance
-
Story
Books 1-3 and the prequel novella of the Breakers series.
-
-
So glad I downloaded this one.
- By Stevie Havoc on 11-16-15
-
Time Salvager
- By: Wesley Chu
- Narrated by: Kevin T. Collins
- Length: 15 hrs and 37 mins
- Unabridged
-
Overall
-
Performance
-
Story
Convicted criminal James Griffin-Mars is no one's hero. In his time, Earth is a toxic, abandoned world, and humans have fled into the outer solar system to survive, eking out a fragile, doomed existence among the other planets and their moons. Those responsible for delaying humanity's demise believe time travel holds the key, and they have identified James, troubled though he is, as one of a select and expendable few ideally suited for the most dangerous job in history.
-
-
Thrilling time-traveling adventure full of twists.
- By Daniel on 11-13-15
By: Wesley Chu
-
Titanborn
- By: Rhett C. Bruno
- Narrated by: R.C. Bray
- Length: 7 hrs and 23 mins
- Unabridged
-
Overall
-
Performance
-
Story
After decades hunting wanted offworlders throughout the solar system, Corporate Bounty Hunter Malcolm Graves doesn't bother asking questions. So long as the pay is right, he's the man for the job. And he always works alone. But when a high-profile bombing on Earth has Pervenio Corp clamoring for answers, they force him to team up with a strange, cyber-augmented partner. A young man more interested in statistics than instinct. Their assignment: Track down a suspected group of extremists from Titan who will go to any length to free their moon from the grip of Earth's corporations.
-
-
Great Mystery Sci-fi
- By Bryan on 02-08-19
By: Rhett C. Bruno
-
The Dragon's Egg
- Dragonfall, Book 1
- By: David A. Wells
- Narrated by: Derek Perkins
- Length: 11 hrs and 48 mins
- Unabridged
-
Overall
-
Performance
-
Story
Seventy-five years ago, the dragons fell from the sky. We thought they were just meteorites - six terrifying explosions rang the world like a bell. When the dust settled, we went on with our lives as though nothing had happened. More than a decade later, five of the eggs hatched. The dragons that emerged were small and weak. They kept to the shadows, working in secret to persuade people to do their bidding, offering magic as payment and reward. Years passed...and still we didn't notice the evil growing in our midst.
-
-
Acting out of character
- By Skipper on 01-27-18
By: David A. Wells
-
Control Point
- Shadow Ops
- By: Myke Cole
- Narrated by: Corey Jackson
- Length: 15 hrs and 4 mins
- Unabridged
-
Overall
-
Performance
-
Story
Myke Cole is an expert at ratcheting up suspense and delivering pulse-pounding adventure that leaves audiences breathless. In Shadow Ops: Control Point, the world has seemingly gone mad. People are waking up with magical powers, such as the ability to raise the dead or call forth storms. The only thing staving off a plunge into chaos is the Supernatural Operations Corps, headed by Oscar Britton. But when Oscar exhibits a power of his own, the hunter becomes the hunted.
-
-
get on with it
- By Eugene on 05-15-12
By: Myke Cole
-
Prominence
- By: A. C. Hadfield
- Narrated by: Marc Vietor
- Length: 6 hrs and 50 mins
- Unabridged
-
Overall
-
Performance
-
Story
They tried to destroy our planets. Our way of life. They tried to send us into extinction. But we, the Coalition, fought them and won. That was a decade ago. They’re known as the Host: a cabal of aliens seeking to dominate our sector of space. And they’re back - with help from a powerful new enemy. We’re outnumbered and unprepared. But there is hope. An ancient race of long-dead but technologically advanced aliens called the Navigators have a ship called the Blackstar that could potentially turn the tide. That is if I, Kai Locke, a humble ship racer, can find it and learn how to harness its power in time.
-
-
Newly found love.
- By L. Rampey on 03-22-19
By: A. C. Hadfield
-
Arcadian Genesis
- By: Greig Beck
- Narrated by: Sean Mangan
- Length: 5 hrs and 29 mins
- Unabridged
-
Overall
-
Performance
-
Story
Alex Hunter - in the mission that turned him from a normal man into the weapon known as the Arcadian - and the elite team of soldiers known as the Hotzone All-Forces Warfare Commandos must enter a hostile country to rescue a defected Chechen researcher from the centre of a country at war. But the HAWCs are not the only ones looking for the rogue scientist and the mysterious package he carries with him. A brutal and relentless killer and his death squad are on the trail, too - and they bring a savagery with them that Hunter and his team have never witnessed before in modern warfare.
-
-
Not bad, but not great
- By Michael on 02-27-22
By: Greig Beck
-
Invasion
- Book One of the Secret World Chronicle
- By: Mercedes Lackey, Steve Libbey, Cody Martin, and others
- Narrated by: Nick Sullivan
- Length: 16 hrs and 56 mins
- Unabridged
-
Overall
-
Performance
-
Story
The world had become used to the metahumans - people sometimes perfectly ordinary, but sometimes quite extraordinary in appearance - who mostly worked with their governments as high-powered peace officers, fighting crime, and sometimes fighting rogue metahumans who had become super-criminals. Then that comfortable world ended in just one terrifying day.
-
-
It's ...okay.
- By C Yohe on 10-16-12
By: Mercedes Lackey, and others
-
Dire: Fate
- The Dire Saga, Book 0.5
- By: Andrew Seiple
- Narrated by: Amy McFadden
- Length: 48 mins
- Unabridged
-
Overall
-
Performance
-
Story
All Doctor Dire wants to do is save the world. But those pesky heroes keep getting in the way, and it's all she can do to give them a good fight without killing them. Supervillainy is such an underappreciated job these days....
-
-
A good taste
- By AV on 02-23-21
By: Andrew Seiple
-
Last Command
- Fallen Empire, Book 0
- By: Lindsay Buroker
- Narrated by: Kate Reading
- Length: 2 hrs and 26 mins
- Unabridged
-
Overall
-
Performance
-
Story
In the final days of the empire, Cyborg Corps Colonel Leonidas Adler plans to die in a manner befitting of an imperial officer. He will fight until his last breath, giving his life to defend Emperor Markus, as it was meant to be. But when the emperor himself summons him for a final special mission, how can he refuse?
-
-
Pretty good teaser for lighter space opera
- By 🔥 Phx17 🔥 on 10-15-21
By: Lindsay Buroker
-
Gabriel: Zero Point
- Evan Gabriel Trilogy
- By: Steve Umstead
- Narrated by: Ray Chase
- Length: 2 hrs and 43 mins
- Unabridged
-
Overall
-
Performance
-
Story
Evan Gabriel wasn't always a feared and respected North American Federation Navy Commander. Before dangerous missions to the ice-bound planet of Poliahu, the deadly jungle world of Eden, and politically corrupt Mars, he was a simple recruit, fighting to make his mark in the elite Naval Special Forces…and was part of a top-secret military experiment that would change his life forever. Zero Point tells the tale of a young man faced with difficult choices and dangerous trials.
-
-
THE FLICKER OF THAT MEMORY
- By Jim "The Impatient" on 05-29-14
By: Steve Umstead
-
Plague of the Dead
- The Morningstar Strain, Book 1
- By: Z. A. Recht
- Narrated by: Oliver Wyman
- Length: 10 hrs and 55 mins
- Unabridged
-
Overall
-
Performance
-
Story
The end begins with a viral outbreak unlike anything mankind has ever encountered before. The infected are subject to delirium, fever, a dramatic increase in violent behavior, and a one-hundred percent mortality rate. Death. But it doesn't end there. The victims return from death to walk the earth. When a massive military operation fails to contain the plague of the living dead it escalates into a global pandemic.
-
-
YOU MIGHT WANT TO PUT DOWN THAT CUP OF COFFEE
- By Jim "The Impatient" on 09-08-16
By: Z. A. Recht
-
The Pearl Wars: Skyship Academy, Book 1
- By: Nick James
- Narrated by: Jeffrey Kafer
- Length: 8 hrs and 29 mins
- Unabridged
-
Overall
-
Performance
-
Story
A devastated Earth's last hope is found in Pearls: small, mysterious orbs that fall from space and are capable of supplying enough energy to power entire cities. Battling to control the Pearls are the Skyship dwellers -political dissidents who live in massive ships in the Earth's stratosphere - and the corrupt Surface government.
-
-
Starts slow but picks up in the quarter...
- By Karissa Eckert on 12-11-16
By: Nick James